20.08_S,M,L,XL

Rehabilitation of the Tower of San Andrés

IN COLLABORATION WITH

CLIENT

Public

LOCATION

San Andrés, Santa Cruz de Tenerife, Spain

CATEGORY

Rehabilitation / Public space / Landscape

COMPETITION

First Prize

To intervene in a building such as the Torre de San Andrés, an Asset of Cultural Interest (BIC) since 1949, and one of the most recognizable symbols of Anaga, requires an in-depth investigation of its history, from the motivations that led to its construction on the site, through for an exhaustive analysis of the problems and pathologies that the structure has suffered throughout its useful life, until its period as a ruin for the last 126 years. 

This proposal is based on the maximum respect for the heritage asset, devoting most of its development to the study and analysis of the tower, as well as its surroundings in different extents, for which reason both the analysis and the proposal have been ordered in what we call S, M, L and XL scales; calling Scale S the perimeter currently fenced by the palisade, Scale M the Protection Environment of the BIC, Scale L San Andrés and its natural environment, and Scale XL the territorial area of ​​Anaga.

espadana
SMLXL_Infografia_01

 The intervention is articulated in five arguments that promote the enhancement of the Torre de San Andrés, its protection environment, and its importance within the territorial scale.

Planta-Cubierta-no-borde

Master plan

PROPOSAL

The five arguments:

1 — Maintain the ruin as a symbol of San Andrés, a historical monument that has been in its current state for 126 years, that no one knows of in “one piece”, and that is thus represented in the different institutions in the area, such as neighborhood associations, the public school, or the soccer team. The existing structures with their pathologies are consolidated, ruling out the reconstruction of the Tower to its original state.

2 — Rehabilitate the Protection Environment. Urban landscape at the service of the BIC, a historical monument that has been in its current state for 126 years, that no one knows of in “one piece”, and that is thus represented in the different institutions in the area, such as neighborhood associations, the public school, or the soccer team. The existing structures with their pathologies are consolidated, ruling out the reconstruction of the Tower to its original state.

3 — The Tower of San Andrés as the gate of Anaga, a historical monument that has been in its current state for 126 years, that no one knows of in “one piece”, and that is thus represented in the different institutions in the area, such as neighborhood associations, the public school, or the soccer team. The existing structures with their pathologies are consolidated, ruling out the reconstruction of the Tower to its original state.

4 — The interior spaces of the tower generate the Visitor Center, a historical monument that has been in its current state for 126 years, that no one knows of in “one piece”, and that is thus represented in the different institutions in the area, such as neighborhood associations, the public school, or the soccer team. The existing structures with their pathologies are consolidated, ruling out the reconstruction of the Tower to its original state.

5 — Minimize execution costs, maintenance and ecological footprint, a historical monument that has been in its current state for 126 years, that no one knows of in “one piece”, and that is thus represented in the different institutions in the area, such as neighborhood associations, the public school, or the soccer team. The existing structures with their pathologies are consolidated, ruling out the reconstruction of the Tower to its original state.

Planta-Baja-no-borde

Main plan

METHODOLOGY AND INTERVENTION CRITERIA

Based on the previous arguments, 18 specific actions are articulated, structured in three intervention blocks

A — CONSOLIDATION OF THE HISTORICAL MONUMENT

#1 Analize — Study and documentation

#2 Preserve — The ruin in its state

#3 Consolidate — Ruin structures

#4 Clean — Remove addons

#5 Restore — Surviving original elements

#6 Recover — Demolished spaces (new building)

B — ECOLOGICAL URBAN ENVIRONMENT

 #7 Oxygenate — The Protection Environment

#8 Restrict — Car parks in the Protection Environment

#9 Limit — Road traffic

#10 Prioritize — Pedestrian and electric mobility

#11 Connect — Barranco del Cercado and Avenida Marítima

#12 Interconnect — Environment and Culture of Anaga

#13 Integrate — Economic and social fabric of San Andrés

C — VISITOR CENTRE ABOUT THE HISTORY OF THE TOWER OF SAN ANDRÉS

#14 Make visible — The history of the Tower through its rooms

#15 Revalue — The story of San Andrés

#16 Zoom — The neighbor and the visitor

#17 Minimize — Construction costs, maintenance and carbon footprint

#18 Digitize — Virtualize 3D of the ruin and its history

Vista-Interior
SMLXL_Infografia_03

MORE PROJECTS

CASA PINTOR AGUIARAccessibility / Rehabilitation / Landscape / Heritage

ROBAYNAResidential / Renovation

CUESTA PIEDRAPublic space / Cultural/ Urban Planning

SAN MIGUELRenovation / Residential

MALPAÍSLandscape / Public Space / Urban Planning

La JuradaSocial Housing

CASA PINTOR AGUIARAccessibility / Rehabilitation / Landscape / Heritage

SAN MIGUELProject type

San ClementeRenovation

San ClementeRenovation

SMLXLRehabilitation / Public space / Landscape / Urban Planning / Heritage

PalmetumRehabilitation / Landscape / Cultural

HamiltonRenovation / Interior Design / Office Space

Parque La PazHospitality / Renovation

Casa PeKeRenovation / Residential

Cine La VeraRenovation / Commercial

© 2021 - 2023 Jorge Díaz Estudio.  All rights reserved.